Adding rigid foam insulation to the frost wall under the walk-out wall.
View toward neighbors' shed.
View toward the river from top of driveway.
Under the basement floor: rigid foam insulation, and then sand on top of that.
Foundation is done, and basement insulation in place.
Septic field is nearly ready for burial.
The septic system leach field.
Septic tank.
Joists for main deck installed.
The basement walk-out wall and the first-floor deck are complete. Ready to start erecting the frame.
The timber frame was delivered today (under the tarps), along with the siding and the shingles.
August 18: Early afternoon.
August 18: At the end of the first day of frame erection.
August 18: Some examples of the joinery.